C) 2000 Ecopave Australia
Eerik Owerhall with 4.3 tons of GEO320 MRH granulated asphalt bitumen binder.
4,3 tons of GEO320 MRH granulated asphalt bitumen ready for the Boral Asphalt Field Trial.
Some problems with the GEO320 granule conglomeration
Box preparation for unloading the GEO320 granules.
GEO320 RandD bitumen binder reactor.
Sakary drying the GEO320 granules.
Armstrong Holland 5 ton per hour mobile batching plant for GEO320 RandD work.
Sakary Malmberg with GEO320 bitumen binder Granules.
Thermoline GEO320 RandD Factory in Campbellfield 1999 - 2001.
Thermoline GEO320 RandD Factory.
Inside the Thermoline RandD factory 1999 - 2001.
C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
(C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
C) 2000 Ecopave Australia
Page 6 of 10
Copyright (C) 2004-2009 Ecopave Australia
All Rights Reserved
GEO320 MRH Field Trial Preparation